Capacity required before a customer deadline
A manufacturer is comparing a locally available used machine with a new machine that has a longer lead time.
Questions to resolve
- Can the used machine hold the required tolerance and cycle time?
- What service, calibration and utilisation evidence is available?
- What installation, tooling, software and commissioning work is required?
- What production and warranty risk remains after inspection?
Decision rule: Compare verified total acquisition cost and time-to-capacity under the same production assumptions. Do not compare asking price with new list price alone.